Skip to main content

SprayTech Powder Coating

Embassy Gardens London

Powder Coating Embassy Gardens

Project Overview

Spraytech was proud to contribute to the prestigious Embassy Gardens development in Nine Elms, London — a landmark residential project delivered by leading contractor Ballymore.

Located at Nine Elms Lane, SW8, Embassy Gardens is known for its high-end architecture and premium finishes, requiring exceptional attention to detail across every element.

Scope of Work

Spraytech was commissioned to provide specialist coating services for the following:

  • Balustrades
  • Balcony bases
  • A wide range of additional architectural metalwork items

Given the scale of the development, the project involved processing hundreds of individual components over an extended period.

Process & Finish

To meet the aesthetic and durability requirements of the project, Spraytech applied:

  • Dark Bronze Polyester Powder Coating

This finish was selected to complement the building’s modern architectural design while ensuring long-term performance in an external environment.

The project utilised Spraytech’s large-capacity industrial oven, allowing for the efficient handling of large and high-volume items without compromising quality.

Exterior of the new US Embassy building in Nine Elms, Wandsworth, London.

Challenges & Quality Control

One of the key challenges on this project was the metallic nature of the finish.

Metallic coatings demand:

  • Consistency in application
  • Precise control of curing conditions
  • Flawless surface preparation

Even minor inconsistencies can be highly visible, especially across large batches of components installed in prominent residential areas.

Spraytech addressed this by:

  • Implementing strict quality control procedures
  • Maintaining consistency across all items and batches
  • Leveraging experienced operators and controlled processes

The result was a uniform, high-quality finish across all coated elements.

Project Delivery

  • Duration: Several months
  • Volume: Hundreds of items processed
  • Approach: Phased delivery to align with project timelines

The scale and duration of the project required careful coordination to ensure timely turnaround while maintaining Spraytech’s high standards.

Outcome

Spraytech successfully delivered a premium coating solution that met the aesthetic and technical demands of one of London’s most high-profile residential developments.

The finished components:

  • Enhanced the visual appeal of the building
  • Provided long-lasting protection against environmental exposure
  • Met the expectations of both the contractor and end client

Leave a Reply

Your email address will not be published. Required fields are marked *